Installation of audio equipment in the concert hall and in the apparatus room Folk Theater Russian Song
Projects
Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song

Installation of audio equipment in the concert hall and in the apparatus room Folk Theater Russian Song

  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
  • Installation of audio equipment in the concert hall and in the apparatus room  Folk Theater Russian Song
Всего 18 фотографий
The latest sound equipment has been installed. The speaker system has been tuned. The complex meets all the requirements for carrying out diverse cultural and entertaining events with the participation of top officials of the country and prominent cultural figures.

The project included a full operation cycle: from conducting acoustic surveys and finding suitable solutions for the hall of this format to the supply of the equipment, installation and final putting the hall into operation.

DNK Corporation engineers together with the technical staff of the theater measured acoustic parameters of the hall to create the equal sound pressure throughout the stage, performed the calculations and selected the necessary equipment. A project for the integration of the new equipment into the existing system was developed. All this provided the opportunity to create a fully equipped system, taking into account the diversity of the events held in the theater.

When agreeing the equipment list the customer faced the traditional dilemma: the optimization of the price-quality ratio. Together with the customer the uncompromising solution was found, which allowed to create a really high-quality audio amplification system. The sound space of the concert hall is formed with the help of the stage monitors and sound speakers of L-Acoustics, which is famous to be excellent acoustics, used in many prestigious halls around the world. The optimal location of the acoustic cabinets, the height of their suspension, the tilt angle, the composition of the cluster - all this was obtained at the design stage.

DNK Corporation's sound engineers have done everything possible to ensure that the acoustics of the stage space can correspond to the high status of the theater. The rehearsals and concerts of any repertoire and of any level of complexity with the participation of the maximum possible casts of the orchestra, the choir and the vocalists can be organized there.

The main highlight of this installation was that from the moment the customer applied to DNK Corporation and the contract close out only 25 days had passed. This is a very short period. Usually the implementation of projects of such level takes at least three months.

Events of the "Russian Song" Theater, which take place at the renewed concert venue

• Solo performances of Nadezhda Babkina

• The musical "The Night Before Christmas"

• The Nika-2015 Ceremony

•Various Performances

• Concerts

• Children’s New Year parties




Project Result
The level of the project implemented allows carrying out the concert events stipulated by the state programs of the Russian Federation.
Our Telegram Channel
1
X